Alin Construction Machinery
Mobile:0086-13963008195 ( WhatsApp/ Wechat )
Email: info@alingroupchina.com
Copyright © 2024 Shandong Alin Electric Vehicle Co. , Ltd
Sincerely invite you to visit our factory!
WELCOME TO ALIN GROUP
CONTACT US
Shandong Alin Electric Vehicle Co. , Ltd
Add.:Dongcheng Street, Economic develop zone, Liaocheng, China
Tel:0086-635-2113234
Mobile:0086-13963008195
Email:info@alingroupchina.com
Http://www.alingroupchina.com
Http://www.alinmachinery.com
CATEGORY
1. Batching and casting building is batching part of AAC block plant. Casting building can be reinforced concrete structure or weld steel structure. Its load bearing should be at least 200 tones.
2. There are three raw materials silos at top of casting building. It is cement, lime powder and gypsum powder. The raw materials is transported to powder weighing tank for measuring. The quantity of raw materials can be measured by semi-automatic or automatic control system in cumulative metering.
3. The second floor is powder weighing tank and slurry weighing tank. Coal fly ash or sand is mixed to be slurry powder. This slurry is pumped to slurry weighing tank. The measuring can be controlled with semi-automatic or automatic control system.
4. The first floor is casting mixer and aluminum mixer. The three kind of raw materials (cement, lime powder, gypsum) and slurry are sent to casting mixer for mixing after being measured. Aluminum powder can be added by worker after measuring.
5. Machine parts including: (1) Casting Building ( three floors) (2) One set cement silo
(3) One set Lime powder Silo (4) One set gypsum silo (5) One set powder weighing tank
(6) One Slurry Weighing Tank (7) Three Screw Conveyors
(8) One set casting Mixer (9) One set aluminum slurry mixer.